Margaret Street Project - Design

About the Project

The utilities beneath Margaret Street, Court Street, and Brinkerhoff Street within the primary study area are deteriorating, aging, and not working as they once did. The aging infrastructure is in need of replacement. The existing public utilities including storm sewer system, sanitary sewer mains, and water mains are to be replaced. The City is looking to be proactive and replace these utilities that have aged out or deteriorated before more breaks, backups, and disruptions occur. 

Due to the construction impacts and roadway disruptions required when replacing utilities, which include deep excavations and replacement of laterals to individual properties, the work will require the reconstruction of Margaret Street throughout the primary study area. This work is the motivator for this project, using the need for urgent infrastructure replacement work as an opportunity to reimagine the Margaret Street corridor as a treasured community asset. 

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.

Project Limits (Typical Sections)

The map below depicts the different typical section regions and the proposed direction of vehicular travel. The typical sections shown are a representation of the proposed street geometry.

Project Area

Project Area and Sections

Road Sections

These are the different "sections" of the Margaret Street Project.

Bike Circulation Map

Bike Traffic and Flow for Project Area

Phases

Phases overview
Phase 2: Public Outreach Round #1
Public Outreach Round #1
Phase 3: Public Outreach Round #2
Public Outreach Round #2
Phase 4: Draft Concept Study Final Report
Draft Concept Study Final Report
Phase 6: Advertise and Bidding
Advertise and Bidding

Project Launch

September 1, 2021 4:00 AM - November 10, 2021 5:00 AM

City of Plattsburgh Project Team

  • Christopher Rosenquest - Mayor
  • Andrew Durrin - Assistant Superintendent, Department of Public Works 
  • Michael Bessette - Superintendent, Department of Public Works 
  • Courtney Meisenheimer - Community Engagement Coordinator
  • Elisha Bartlett - Senior Planner

Public Advisory Committee

The project advisory committee (PAC) consists of business owners, property owners, and residents who are intimately involved with Margaret Street. These individuals volunteer their time and assist in project decisions and are ambassadors for this project.  

  • Caitlin Bopp - City Common Council
  • Kyle Dyer - SIP 
  • Tom McNichols - Strand Center for the Arts 
  • Alyssa Senecal - North Country Chamber of Commerce 
  • KT Teaney - Old Soul 
  • Meghan Weeden - City Zoning Board 
  • Karl Weiss - Resident 

Consulting Firm

C&S Companies is an architectural and engineering firm, that has been hired to assist the City of Plattsburgh with the Margaret Street Project. 

  • Kelli McArdell - Project Manager
  • Todd Humphrey - Project Principal
  • Shannon Gallagher - Engineer
  • Liam Mussi - Assistant Engineer
  • Frank Mento - Client Liaison 

Meetings

Infrastructure Meeting on September 7th 2021


Common Council Meeting on September 16th 2021